P8: Engineering of Decentrally Controlled Production and Logistics Systems

Project Description:

In the context of Industry 4.0 production and logistics are based on cyber-physical components that flexibly cooperate in order to realize an efficient production process. In turn, these components utilize techniques from cognitive computing to make decentralized decisions. In general, the efficiency of any production logistics system depends on the implementation and configuration of its components. The design of such a system and the modeling of the behavior of its intelligent components influence each other. In turn, this significantly increases the design complexity of factory planning. Project P8 aims at the development of systems engineering methods for planning and configuring smart factories.


Direct supervisor:

Tandem partner:


Affiliation:University of Applied Sciences Ulm
Methods/Technologies:planning & reasoning
Applications:Industry 4.0, decentralized logistics

 

Application

This project is vacant - apply now!